2013-08-09 - 7003 - Procedure - SAP AFS Upgrade #MMPPSupport
SPECIFICATIONS
7003-Spec-ReCap Ticket Summary
Purpose
Assign appropriate factory calendars to routes.
Admin Info
Purpose
|
SAP AFS Upgrade to 6.5
|
Requested By
|
Babu Lankipalli
|
Spec Created By
|
Adithya
|
Spec Created Date
|
08/09/2013
|
Spec QA by
|
Adithya
|
Objects
|
|
Document Status
|
Complete
|
References
Prior Tickets
Documents
Z-Tcodes_NES.xlsx
Functional Requirement
Support for the system upgrade form SAP AFS ECC 6.0 to SAP AFS ECC 6.5 testing the
Solution Summary
[Discuss this section with Requester and get approval prior to beginning work]
1. Upgraded SAP GUI to version 710 patch level 22 to be consistent with the requirements of ECC 6.5
2. Classified and checked the customized objects under T-Codes, Programs and Functional Modules in sandbox environment ECC 6.5.
3. Checked Supply Chain related OSS Notes in Sandbox and compared the same with Production Environment.
4. Found few new fields and analyzed the impact of it.
5. Analyzed SPDD & SPAU entries and provided recommendations.
6. Carried out basic testing (Few scenarios were tested in Sandbox environment).
7. Testing carried out on all the Z-T.codes : File attached Z-Tcodes_NES
8. Carried out Basic Testing on the New DEV server before the system is upgraded.
Test Plan
Solution Details
[Provide complete technical details for configuration or programming here]
Issues
1. Purchase Order Dump Update Info structure S431.
When a purchase order is created in AFS upgraded (6.5) version there is a dump.
Carried out the Manual steps required for this as mentioned in the OSS Note : 949394.
sapnote_0000949394.pdf
OSS Note - Manual Steps.doc
2. Issue when FGEN Material is being created - [Not Resolved raised to SAP]
FGEN.doc
3. In Transaction CT04 we see that the RELEVANCE push buttons are missing.
Found an OSS notes which is relavant to the issue: Informed NE
CT04-OSSNote-1041015.pdf
4. PMS Color field is missing in the material master:
There was a configuration issue which was not moved though the transport is moved copied.
5. Material Creation Programs:
6.
Testing and Validations :
NES:
NECNED:
NECNEQ: